How the models work · Moisture model
The moisture simulation at a glance
Again, everything is calculated in your browser. The method follows the standard approach for transient heat and moisture in building components (EN 15026, after Künzel). In outline:
- Build a typical year of outdoor temperature, humidity, sun and rain showers, in two-hour steps, from the monthly tables.
- Cut each layer into thin slices, each with its own temperature and humidity.
- At every step, work out the heat flow, and the vapour and liquid water flow, between neighbouring slices and at the two faces.
- Update each slice's temperature and the water it holds, storing water along each material's sorption curve.
- Shed rain the face can't take up and water condensing in a cavity, and feed in ground moisture.
Every layer starts at 80% humidity in October, and the year is run again and again until it repeats: until a year's wettest and driest month ends are within 2% of the year before's. That takes at least three years, and longer for thick masonry, which can take five to eight to settle; the run stops at twelve. The results come from the last year, by which time that starting guess has washed out. The first year is kept to show whether a wall is still getting wetter.